
|
Falcon
Drilling Argentina
At Right - Current 2008 drilling location in Argentina.. |
![]() |
The Argentinian division is fully licenced and legally
registered in Argentina. Local headquarters is situated in Salta
city in the province of Salta. Operations supervisor is Mr Al
McGregor who may be contacted at al_macgregor@shaw.ca
or the above EMail address in Argentina.
Falcon is currently providing drilling services to Viceroy
Resource Corporation on the Gualcamayo project. Drilling
operations are at an elevation of 1500 to 2000 metres and use NQ
and HQ down hole tools drilling to a typical depth of 300 metres.
It is hoped that the F1000 drill rig will soon be in operation
using BTW sized tools. Water supplies for the drill rigs are
pumped in via a pipeline approximately 10 kms long.
The project is located in the San Juan province, Guandacol
district, Argentina and hosts both gold/base metal skarn and
epithermal gold mineralization in brecciated limestones, marble
and dacite porphyries. The 914 hectare project can be operated on
a year round basis. It was joint ventured from Mincorp
Exploraciones S.A. in mid 1997. Viceroy has the right to earn a
60% interest in the property through its 100% ownership in Minas
Argentinas S.A. by spending US$5.0 million by April 18th 2002. In
addition to the 2630 hectares covered by the joint venture
Viceroy also controls an additional 45,000 hectares surrounding
the project.
Geological mapping, sampling and a 2600 metre diamond drilling
program confirmed the presence of widespread mineralization,
extending the zone for at least 1 kilomtere along strike, up to
200 metres down-dip and defining a vertical extent of up to 300
metrres. Significant intercepts are summarized in table 1
| Drill Hole # | From (m) | To (m) | Interval (m) | Grade (gpt) |
| QD-01 | 10.0 | 146.0 | 136.0 | 0.939 |
| QD-02 | 12.0 | 74.0 | 62.0 | 2.72 |
| QD-03 | 16.4 | 33.2 | 16.8 | 0.889 |
| QD-05 | 1.9 | 132 | 130.1 | 1.12 |
| QD-06 | 3.6 | 218.0 | 214.4 | 0.634 |
| QD-07 | 3.0 | 148.0 | 145.0 | 0.638 |
| QD-08 | 0 | 143.0 | 143.0 | 0.634 |
| QD-09 | 260.0 | 282.0 | 22.0 | 1.08 |
| QD-10 | 0.3 | 47.5 | 47.2 | 1.32 |
| QD-12 | 4.0 | 60.0 | 56.0 | 2.19 |
| QD-14 | 82.0 | 86.0 | 4.0 | 1.46 |
Information on this project was kindly provided by Viceroy Resource Corporation who may be contacted at :- Suite 2200, 1066 West Hastings St., Vancouver, B.C. V6E-3X2, Canada, telephone 604 688 9780, fax 604 682 3941. The information contained in this web page is for the purposes of illustrating the types of drilling operations undertaken by Falcon Drilling and is not to be used in any way to assess the viability of the property or for investment purposes. For further project exploration and geological details visit Viceroy Resource Corporation at http://www.viceroyresource.com
This page last updated 03/29/1999