Mexico Equipment and workshop group.

These images illustrate the capabilities of the Falcon fabrication and maintenance personnel. The new mobile F2000 drill rig was built in house and is shown at center top with the mast in the transit position. The design allows the mast to be lowered to such a degree that clearance of overhead obstacles during transit is maximized and is particularly valuable when passing under low overhead electrical and communications lines in rural areas. All of the mobile F2000 illustrations were taken shortly before final completion at which stage the requisite safety gear e.g. perimeter safety chains, protective shields, fire suppression etc., will be installed. Mobile F2000 in transit configuration.
Mobile F2000 in transit configuration.

Falcon Perforaciones Mexico office and workshop in Hermosillo.
Falcon Perforaciones Hermosillo office
and workshop.
Mobile F2000 final testing.
Mobile F2000 final testing prior to deployment for field trials.
Falcon Perforaciones maintenance personnel.
Fabrication and Maintenance personnel:-
Mobile F2000 safety shield testing.
Testing deployment of protective shields
during mast erection on Mobile F2000.
Mobile F2000 hydraulics and Operators console.
Mobile F2000 operator control station and hydraulic installation.
Workshop
Fabrication and Maintenance shop.
Mobile F2000 development team.
Return.