Mexico Equipment and workshop group.
| These images illustrate the capabilities of the Falcon fabrication and maintenance personnel. The new mobile F2000 drill rig was built in house and is shown at center top with the mast in the transit position. The design allows the mast to be lowered to such a degree that clearance of overhead obstacles during transit is maximized and is particularly valuable when passing under low overhead electrical and communications lines in rural areas. All of the mobile F2000 illustrations were taken shortly before final completion at which stage the requisite safety gear e.g. perimeter safety chains, protective shields, fire suppression etc., will be installed. | ![]() Mobile F2000 in transit configuration. |
![]() Falcon Perforaciones Hermosillo office and workshop. |
![]() Mobile F2000 final testing prior to deployment for field trials. |
![]() Fabrication and Maintenance personnel:- |
![]() Testing deployment of protective shields during mast erection on Mobile F2000. |
![]() Mobile F2000 operator control station and hydraulic installation. |
![]() Fabrication and Maintenance shop. |
![]() |